SITE VISIT: 20/04/16 Site Supervisor Visit/Inspection Lockup

Had my first site visit with the SS (that i organised) as i had an appointment with the florist in the morning at Barwon Heads, so i thought it would be a good time to see it in the daylight during a weekday (stupid daylight savings) and he took me through to have a look at how it's all going.

• Bricks finished
• Cornices all finished
• Cabinetry 80% done (bathrooms and laundry finished, kitchen still to be completed)
• Internal doors delivered 


Bricking on the front window is in! (Getting rendered)

Master bedroom window waiting to get installed 

Master ensuite vanity has been installed! 

Master ensuite vanity

Laundry 

Laundry bench 

Spot for the washing machine 

Dryer's new home under the bench 

Bathroom Vanity


Broom Closet in Laundry

Kitchen 1/2 way done with the cabinetry (Overheads aren't up yet, just sitting on bench)

Wine rack for above fridge space 

Kitchen draws
Internal doors delivered and timber front door

  
 
Timber front door peaking out