Blog Archive

Sunday, 29 May 2016

SITE VISIT: 27/05/16

We had an emergency family situation back in our hometown, so we had to drive back there on Friday morning. We stopped past the house on the way to take a look and called our SS to organise to take a look inside. The plumbing/electrical/heating/cooling/data has all been done with the exception of the bathroom basins, which were apparently missing for a few days. The flooring is due to start today (Monday 30th) and should be done in a couple of days hopefully. 

Completion Stage:
Brick Clean
Painting
Tiling
Electrical Fitoff
Plumbing Fitoff
Toilets/Basins/Baths/Tapware
Flyscreens
Shelving/Robe Fit out
Splashbacks/Mirrors/Shower Screens
Garage Door
Carpet
Timber Flooring

Collection of Amenities onsite 
Final Builders Clean
Caulking
Final Render Coat
Appliances
Pendants
__________

Touchups
Inspections
Cert of Occupancy
Completion list completed by builder
Bank Valuation
Handover

Here are some photos of where it was at on Friday: 


Sink and Tap are installed in the kitchen YAY! Looks great.


Bathroom vanity tiles are in but not grouted yet

Bath looking shmicko now installed with the taps as well.  

 Front facade feature copper lights are installed, love them! Will look nice when the render colour goes on. 

Theatre wall looking nice. Ensuite sliding door still to go in.

View of the lounge/dining/kitchen 

Kitchen coming together now 

Sink and Tap now installed, looking nice! 

Down lights, heating, cooling and dining table light (to be replaced with fixture after handover) 

Theatre


Heating/cooling thermo controls have been installed. Thinking of puting a plant in this little corner in front of the vent.


Toilets installed

Vanity splashback white subway tiles installed  

Shower head and taps installed 

Main bathroom shower screen still to be installed 

Laundry tap installed and broom cupboad handle 

Master 

 Ensuite vanity - basins, taps, mirror and grout still to come

 Ensuite shower screen, taps and shower head installed

 Delicious ensuite shower rain head with hand held body sprayer. Yasss

 Lounge feature wall

Alfresco fan and down lights installed  

Alfresco outdoor powerpoint installed

Sensor lights installed, but this one needs to be replaced as the left light is broken. 

No comments:

Post a Comment