We had our PCI (Practical Completion Inspection) yesterday 20th June. Which is basically the final inspection where majority of things are supposed to be completed, but you make a final list of anything incomplete and also go through a checklist and every single room with your SS and make points of anything to be touched up, fixed or replaced before handover/settlement. 

Our appointment was at 9:30 and we finished at about 12:00 noon, so it took us about 2.5 hours in total. The house is looking so great, we are just in love with all our selections and how everything is working together. Carlisle Homes have also been great!

Here is a bit of a break down of some of the things i can remember that are getting rectified before our handover/settlement date which is possibly going to be next Thursday 30th June! YIPPIE!!!

• Replace front window next to door with Translucent glass instead of Clear to match door
• Install Security System as included in the promotion (somehow got forgotten)
• Replace stolen facade light with new fixture 
• Rander touch ups from Tradies
• Paint beam over garage with Stoney Creek (light grey) instead of the Namadji (Dark Grey) 
• Stain touchups on the dront door and frame 
• General paint touchups throughout the house
• Replace Glass Splashback (We saw it had some scratches through it)
• Replace pendant light fixtures as they are slightly wrong and also too high
• Some touchups to the grout in bathrooms 
• Some bricks needing to be cleaned 
• Some scratches in downpipes and gutters 
• Some window frames with slight scratches 
• Some downlights are falling down, need to be secured 
• Bathroom light in ensuite relocated to be central to the basin 
• Install handle to toilet door 
• Finish painting the two sliding doors 
• Replace both Garage internal doors from break-ins and paint 
• Buff scratch out on stone benchtop in kitchen 
• Fix wobbly wall/plaster joins in pantry and ensuite near doorway 


That's all i can recall at the moment. But it's all apparently doable within the next week or so, so we are fingers crossed having a move in day of Thursday next week! :) 